工程管理论文(英文)

It is well known that the specialty—construction management plays a more and more significant role in the development of the society in recent years. From the beginning its came into being to its change with the reform of economic system, construction management also change its process of development. Nowadays, the development of marketization and internationalization spur the rationalization and scientification of engineering cost supervision system, so the way to engineering quota management was carried by the separation of quantity and price, and then establish a mechanism which market competition directed by project quota gradually. Meanwhile, enhancing economic plausibility and rationality, establishing relative message network system and timely release of information, to lining with the needs of market. Our government should enhance the supervision of construction cost, establish the supervision system of construction cost gradually, and normalize the behavior of pricing, to ensure the smooth of project quality and construction. The quality management of construction project is a systemic project, from feasibility study, survey and design to construction, acceptance check and so on, all of this have a problem of quality control. The management of project construction not only is a process to form project entity, but also is a key stage of quality of the final product. So the quality control in management of project construction is the key link in the whole process in project construction, the project quality mainly depend on the management of quality in process of construction stage.

Modern engineering project have a tendency to develop into large scale and

modern with the complexity of project increase exponentially, only manage and control strictly, the quality and schedule of construction can be guaranteed under the condition of growing investments.

Therefore, modern project management mode of “Make detailed planning comprehensively, according to plan strictly, feedback and update timely, track and contrast closely” can’t carry out only through manual lab, only using computer business management system and simple computer network manage pattern also can ’t meet the actual manage demand. On this basis, we think that modern construction project management enterprise to realize modern management model need shifting to intellective management enterprise, establishing the theory and practice framework of enterprise knowledge management combined with computer, knowledge will become the sword of management.

Since the reform and opening-up, the numbers of China construction enterprise have increasing rapidly, but from the actual situation there is a gap between China and international in ability to construction project management, which affects the project management level in China. And the quality of project is an important indicator of project management, Therefore, reforming traditional project management model and improve the quality of quality have became import issue of construction enterprises. The construction industry is one of basic industries in our country, its normal operation related to the sustained development of the national economy directly. In recent years, with the development of market economy have been established

and perfected gradually in China, the construction industry has got an unprecedented improvement. Meanwhile, the rapid development has exposed many problems, the construction project quality, especially the residential construction quality, has became the focus of attention. Engineering projects as construction project products invests and consumes much manual lab, material and energy, construction project quality related to engineering applicability and safeties of lives and property of people. On the other hand, it’s related to the survival of enterprises, so the quality management on the top position is imperative.

Construction project item management is a one-time comprehensive management and control to optimizing the goal with target, goal and content based on specific construction projects. Its connotation is: from the project start to finish, reaching the goal of quality, rate of progress, cost and safety through the project planning and project control. In view of the construction project is disposable, in order to save investment, achieve the goal of energy-saving emission and construction target, and build construction products in accordance with the requirements, we construction personnel must be aware of the importance of project management in the construction process, and pay attention to reinforcing the following aspects in the construction project management in particular case. (I) Quality management

Quality is the life of enterprises and the fundamental guarantee for the development of enterprises. Today, construction market competition has more and more intense. How to improve the quality of the construction management level is

every enterprise managers need to think about. (i) Regime of quality supervision The quality management of the construction project can be summarized by the following words: set goals and clear the lines of responsibility; assign and put it into effect, explain in detail; contra posing the difficulty organizes research; set an example and explore experiences; tracking control and control strictly, do a good job of quality control and regular monitor of the quality of products. Establishing and improving the system of whole process quality monitoring, intervening and controlling project quality through scientific method, means and control mechanism to let the project quality always in a dynamic management.

① Establish the system of quality self-checking. The quality of project involves all aspects of society, and also reflects the level of enterprises management synthetically. In general, any construction project should accept supervision from the enterprises itself. Enterprises self-checking require any construction company establish a effective system of quality supervision, and through the run of this system to improve quality continuously.

② Quality supervision by the third-party. It means enterprises should

accept the supervision by owner, and the type of supervision is the most authoritative now. These two types of quality supervision in above work clearly, communicate closely and compose to the complete system of control construction project quality, so that enterprises can promise project quality achieve desired expect.

(ii) The supervision methods and means

As an administrative staff, controlling the quality of engineering

construction is the most important thing in locale management. Whether the quality of project is good or bad depends on the management level of inspector and the supervision.

① The site supervision in each process of construction operation should

found the problem on-site, point out and correct, use the methods measure honestly combined with overall look-and-feel.

② Call all on-site management personnel together to specify the

common problem in the construction process, have a in-depth knowledge to construction workers, and correct mistakes timely.

③ Write the book of quality control and guidance document. For those quality problems may occur or has occurred, we management personnel should do an introduction and countermeasures in detail, clear responsibility and claim related personnel correct on time.

(II) Schedule management Whether the project can be delivered within agreed timeframe have a direct influence on the development of project economic and social effect results benefit. The factor of human, technology, material, equipment, machine, foundation, funds, climate and environment all affect the process of project schedule. In order to do a good schedule management of project, we need solving the following problems focused.

① Establish the pattern and framework of project management. A successful project must have a successful management team and a standard work mode, operating procedures and business system.

② Establish a strict contract network system. A large project is a

community consists of many construction workers, so it needs a strict contract system to mobilize the enthusiasm of all people so that can avoid sabotage and wrangling each other.

③ Develop a practical project plan of three grades. This plan requires not only the work of construction organization, but also the work of owners, design company and supervision company, what’s more, we should take government which very relative to construction into consideration.

④ Determine the design company, sign the design contract and the

check and review of design quality and speed. Whether the project construction can be carried out smoothly depends on the quality of design.

⑤ The bids and evaluation of construction organization, the sign of

construction contract, including the choice between general contractor and sub-contractors, and sign the contract of support of material and equipment.

⑥ Handle government formalities in earlier stage project plan and

arrange the municipal auxiliary projects. Sufficient communication with government and good relationship are promise to successful project. (III) Cost control

The type of Construction project cost is divided into the budget

cost, plan cost and actual cost. Under the situation of construction cost meet schedule and quality, through the methods of origination, economics, technology and contracts to control the cost in the range of expect. To tighten the project cost management, we can undertake it in the following aspects:

① The enterprises should formulate the work quota, and those money should use according to engineering quantities, and we should calculate the total quantities of manmade. We can control the manmade cost as long as control the manmade quantities so that control the project cost.

② Strengthen material management, establish the system of limits of material requisition, manage the material out of storage strictly, lump sum to those material cost much in site.

③ Improve the utilization rate of equipment and materials. Check on,

repair and maintain the construction machine regularly, rented equipment and material should return to rent company on time to speed up the construction period and reduce the rent cost.

④ Choose a correct construction scheme is the key to shorten the

construction period, improve quality and reduce the cost, in the process of construction, we should try our best to search new techniques, new technology, new materials to r educe costs, improve efficiency.

⑤ Be strict in construction: construction in line with the drawings and the standard, be strict in quality to ensure project quality, reduce the waste of labor and material caused by rework.

⑥ Streamline the management mechanism, reduce the level of management to save the construction management fees. (IV) Security management

Safety production management of construction projects –organize all activities of production safety, through the control of production factors to reduce or eliminate unsafe behavior and state, does not cause the accident, so as to the normal operation of construction project.

① Adhere to principle of security management. Safety and production are synchronous so that if control the production safety also should be controlled, safety contain in the production, what ’s more, promote and promise the production. Safe working is common thing of anyone relative with production rather than only relative with minority and security mechanism, lack of full participation, security

not obvious.

② Adhere to control the unsafe behaviors of human and unsafe states of things. From the analysis of the causes of the accident, we can get that human, things and environment is the fundamental reason of accident. From the human and things management sides to analyze accident, unsafe human behaviors and unsafe things states are both fundamental reason of accident.

③ Establish safety management measures. Strengthen the safety management of construction engineering, formulate practical safety management system and measures are very important. According to the production management does not have vitality, and effect is

characteristics of construction engineering , formulate the detailed project safety risk prediction and the corresponding guarantee measure and decompose the project risk, implement the safety responsibility to every apartment, every team and everyone to easier management.

To sum up, the construction project management is a systematic

project which includes risk, investment, contract, schedule, quality, personnel and other aspects of the work, and relates to the and design, other supervision, construction, equipment, materials, operations

departments and units. Therefore, only all sides cooperate positively and cogent strengthen construction engineering management of quality, cost, schedule and security so that construction engineering project can be carried out smoothly and create a good economic benefits for the enterprise.

It is well known that the specialty—construction management plays a more and more significant role in the development of the society in recent years. From the beginning its came into being to its change with the reform of economic system, construction management also change its process of development. Nowadays, the development of marketization and internationalization spur the rationalization and scientification of engineering cost supervision system, so the way to engineering quota management was carried by the separation of quantity and price, and then establish a mechanism which market competition directed by project quota gradually. Meanwhile, enhancing economic plausibility and rationality, establishing relative message network system and timely release of information, to lining with the needs of market. Our government should enhance the supervision of construction cost, establish the supervision system of construction cost gradually, and normalize the behavior of pricing, to ensure the smooth of project quality and construction. The quality management of construction project is a systemic project, from feasibility study, survey and design to construction, acceptance check and so on, all of this have a problem of quality control. The management of project construction not only is a process to form project entity, but also is a key stage of quality of the final product. So the quality control in management of project construction is the key link in the whole process in project construction, the project quality mainly depend on the management of quality in process of construction stage.

Modern engineering project have a tendency to develop into large scale and

modern with the complexity of project increase exponentially, only manage and control strictly, the quality and schedule of construction can be guaranteed under the condition of growing investments.

Therefore, modern project management mode of “Make detailed planning comprehensively, according to plan strictly, feedback and update timely, track and contrast closely” can’t carry out only through manual lab, only using computer business management system and simple computer network manage pattern also can ’t meet the actual manage demand. On this basis, we think that modern construction project management enterprise to realize modern management model need shifting to intellective management enterprise, establishing the theory and practice framework of enterprise knowledge management combined with computer, knowledge will become the sword of management.

Since the reform and opening-up, the numbers of China construction enterprise have increasing rapidly, but from the actual situation there is a gap between China and international in ability to construction project management, which affects the project management level in China. And the quality of project is an important indicator of project management, Therefore, reforming traditional project management model and improve the quality of quality have became import issue of construction enterprises. The construction industry is one of basic industries in our country, its normal operation related to the sustained development of the national economy directly. In recent years, with the development of market economy have been established

and perfected gradually in China, the construction industry has got an unprecedented improvement. Meanwhile, the rapid development has exposed many problems, the construction project quality, especially the residential construction quality, has became the focus of attention. Engineering projects as construction project products invests and consumes much manual lab, material and energy, construction project quality related to engineering applicability and safeties of lives and property of people. On the other hand, it’s related to the survival of enterprises, so the quality management on the top position is imperative.

Construction project item management is a one-time comprehensive management and control to optimizing the goal with target, goal and content based on specific construction projects. Its connotation is: from the project start to finish, reaching the goal of quality, rate of progress, cost and safety through the project planning and project control. In view of the construction project is disposable, in order to save investment, achieve the goal of energy-saving emission and construction target, and build construction products in accordance with the requirements, we construction personnel must be aware of the importance of project management in the construction process, and pay attention to reinforcing the following aspects in the construction project management in particular case. (I) Quality management

Quality is the life of enterprises and the fundamental guarantee for the development of enterprises. Today, construction market competition has more and more intense. How to improve the quality of the construction management level is

every enterprise managers need to think about. (i) Regime of quality supervision The quality management of the construction project can be summarized by the following words: set goals and clear the lines of responsibility; assign and put it into effect, explain in detail; contra posing the difficulty organizes research; set an example and explore experiences; tracking control and control strictly, do a good job of quality control and regular monitor of the quality of products. Establishing and improving the system of whole process quality monitoring, intervening and controlling project quality through scientific method, means and control mechanism to let the project quality always in a dynamic management.

① Establish the system of quality self-checking. The quality of project involves all aspects of society, and also reflects the level of enterprises management synthetically. In general, any construction project should accept supervision from the enterprises itself. Enterprises self-checking require any construction company establish a effective system of quality supervision, and through the run of this system to improve quality continuously.

② Quality supervision by the third-party. It means enterprises should

accept the supervision by owner, and the type of supervision is the most authoritative now. These two types of quality supervision in above work clearly, communicate closely and compose to the complete system of control construction project quality, so that enterprises can promise project quality achieve desired expect.

(ii) The supervision methods and means

As an administrative staff, controlling the quality of engineering

construction is the most important thing in locale management. Whether the quality of project is good or bad depends on the management level of inspector and the supervision.

① The site supervision in each process of construction operation should

found the problem on-site, point out and correct, use the methods measure honestly combined with overall look-and-feel.

② Call all on-site management personnel together to specify the

common problem in the construction process, have a in-depth knowledge to construction workers, and correct mistakes timely.

③ Write the book of quality control and guidance document. For those quality problems may occur or has occurred, we management personnel should do an introduction and countermeasures in detail, clear responsibility and claim related personnel correct on time.

(II) Schedule management Whether the project can be delivered within agreed timeframe have a direct influence on the development of project economic and social effect results benefit. The factor of human, technology, material, equipment, machine, foundation, funds, climate and environment all affect the process of project schedule. In order to do a good schedule management of project, we need solving the following problems focused.

① Establish the pattern and framework of project management. A successful project must have a successful management team and a standard work mode, operating procedures and business system.

② Establish a strict contract network system. A large project is a

community consists of many construction workers, so it needs a strict contract system to mobilize the enthusiasm of all people so that can avoid sabotage and wrangling each other.

③ Develop a practical project plan of three grades. This plan requires not only the work of construction organization, but also the work of owners, design company and supervision company, what’s more, we should take government which very relative to construction into consideration.

④ Determine the design company, sign the design contract and the

check and review of design quality and speed. Whether the project construction can be carried out smoothly depends on the quality of design.

⑤ The bids and evaluation of construction organization, the sign of

construction contract, including the choice between general contractor and sub-contractors, and sign the contract of support of material and equipment.

⑥ Handle government formalities in earlier stage project plan and

arrange the municipal auxiliary projects. Sufficient communication with government and good relationship are promise to successful project. (III) Cost control

The type of Construction project cost is divided into the budget

cost, plan cost and actual cost. Under the situation of construction cost meet schedule and quality, through the methods of origination, economics, technology and contracts to control the cost in the range of expect. To tighten the project cost management, we can undertake it in the following aspects:

① The enterprises should formulate the work quota, and those money should use according to engineering quantities, and we should calculate the total quantities of manmade. We can control the manmade cost as long as control the manmade quantities so that control the project cost.

② Strengthen material management, establish the system of limits of material requisition, manage the material out of storage strictly, lump sum to those material cost much in site.

③ Improve the utilization rate of equipment and materials. Check on,

repair and maintain the construction machine regularly, rented equipment and material should return to rent company on time to speed up the construction period and reduce the rent cost.

④ Choose a correct construction scheme is the key to shorten the

construction period, improve quality and reduce the cost, in the process of construction, we should try our best to search new techniques, new technology, new materials to r educe costs, improve efficiency.

⑤ Be strict in construction: construction in line with the drawings and the standard, be strict in quality to ensure project quality, reduce the waste of labor and material caused by rework.

⑥ Streamline the management mechanism, reduce the level of management to save the construction management fees. (IV) Security management

Safety production management of construction projects –organize all activities of production safety, through the control of production factors to reduce or eliminate unsafe behavior and state, does not cause the accident, so as to the normal operation of construction project.

① Adhere to principle of security management. Safety and production are synchronous so that if control the production safety also should be controlled, safety contain in the production, what ’s more, promote and promise the production. Safe working is common thing of anyone relative with production rather than only relative with minority and security mechanism, lack of full participation, security

not obvious.

② Adhere to control the unsafe behaviors of human and unsafe states of things. From the analysis of the causes of the accident, we can get that human, things and environment is the fundamental reason of accident. From the human and things management sides to analyze accident, unsafe human behaviors and unsafe things states are both fundamental reason of accident.

③ Establish safety management measures. Strengthen the safety management of construction engineering, formulate practical safety management system and measures are very important. According to the production management does not have vitality, and effect is

characteristics of construction engineering , formulate the detailed project safety risk prediction and the corresponding guarantee measure and decompose the project risk, implement the safety responsibility to every apartment, every team and everyone to easier management.

To sum up, the construction project management is a systematic

project which includes risk, investment, contract, schedule, quality, personnel and other aspects of the work, and relates to the and design, other supervision, construction, equipment, materials, operations

departments and units. Therefore, only all sides cooperate positively and cogent strengthen construction engineering management of quality, cost, schedule and security so that construction engineering project can be carried out smoothly and create a good economic benefits for the enterprise.


相关内容

  • (全英文论文)从少年派的奇幻漂流记论人性与兽性
  • 原创毕业论文公布的题目可以用于免费参考 (全英文论文)A 校英语专业就业情况分析及其对专业课程设置的启示 (全英文论文) 美国历史上黑人所扮演的角色 (全英文论文) 中西广告语中体现的文化差异探讨 (全英文论文) 餐桌布局在美国正式宴会和自助宴会上的差别 (全英文论文) 被遗弃的韦瑟罗尔奶奶中爱伦. ...

  • SCI常用科技论文检索系统简介
  • 常用科技论文检索系统简介--chenxl120--home页码,1/15 chenxl120--home 欢迎大家光临,参与我个人Blog 评论! 欢迎大家光临,这里有大家自由空间! 日 一29162330 18152229 登录 ? Login 日历 ? Calendar 2006-1 二3101 ...

  • 学位论文指导意见
  • (二)格式要求 中文采用国家正式公布实施的宋体简化汉字,英文和阿拉伯数字均应采用Times New Roman字体. 文中采用的术语.符号.代号,全文必须统一,并符合规范化的要求.如果文中使用新的专业术语.缩略语.习惯用语,应加以注释.国外新的专业术语.缩略语,必须在译文后用圆括号注明原文.学位论文 ...

  • 英语毕业论文格式2010
  • 附件一: 英语专业毕业论文格式要求 (2010 年修订) 一. 论文组成 英语专业本科毕业论文(以下简称为毕业论文)由封面.成绩评 定表.中文内容摘要与关键词.英文内容摘要与关键词.英文目录. 正文.参考文献.附录.致谢九部分组成.毕业论文装订按以下顺序 进行:封面.成绩评定表.中文内容摘要与关键词 ...

  • 兰州大学本科毕业论文指导手册
  • 兰州大学本科毕业论文(设计) 指导手册 (试行) 兰州大学教务处编印 二〇〇六年十月 毕业论文(设计)是教学计划规定的综合性实践教学环节,也是实现培养目标的重要教学环节.毕业论文(设计)在培养大学生探求真理.强化社会意识,综合运用所学基础知识.基本理论和基本技能进行科学研究的基本训练.提高综合实践能 ...

  • 学位论文书写格式
  • 硕士.博士学位论文书写格式统一要求 研究生学位论文应用汉字撰写,硕士论文字数一般为3-4万,博士学位论文字数为5-6万字.论文内容要文字简练,说明透彻,推理严谨,立论正确.论文内容一般由十三个主要部分组成,依次为:1. 中文封皮:2. 英文封皮:3. 独创性声明及版权授权书.4. 目录: 5. 英文 ...

  • 兰州大学本科毕业论文格式
  • 本科生毕业论文(设计)写作规范 为保证毕业论文(设计)质量,实现本科培养目标,对我校本科生毕业论文(设计)特做如下规定. 一.毕业论文(设计)的组成 毕业论文(设计)的组成包括:论文封面.目录.论文题目.作者.单位.中文摘要.中文关键词.英文标题.作者英文名.英文摘要.英文关键词.论文正文.参考文献 ...

  • 研究生毕业论文撰写规范
  • 昆明理工大学工业工程系系统模拟报告格式要求 昆理工大机电院工字 [2010] 1号 ----------------------------★----------------------------- 机电工程学院研究生论文报告撰写规范实施细则 (试行) 为了进一步提高我系本科生报告的质量,做到报告 ...

  • 工程硕士学位论文格式的规定
  • 南京工业大学研究生学位论文格式的规定 南工(2007)研字第34号 为了提高研究生学位论文的质量,实现学位论文在内容和格式上的规范化,特作如下规定: 一.内容要求 研究生学位论文按<南京工业大学博(硕)士研究生培养方案>的要求,应做到立论正确,推理严谨,层次分明,数据可靠,文字简练,说明 ...

  • 自然科学(65)
  • 太原科技大学学术论文认定标准 为扩大我校在国内外学术界的知名度,适应我校学科建设和科技发展的新形势,提高我校的综合科技实力,进一步统一和规范学术论文的认定标准,特制定此标准.本标准只针对检索论文和一级论文. ⒈ 检索系统收录论文(见说明): ① 被<SCI>.<EI>.< ...